 |
Corrigendum to work order no. 489/NWZ/BSUP/KMDA |
 |
Construction of four storied biuldingat Nonadanga under BSUP Scheme |
 |
One 4 storied residential building containing 32 nos flats under BSUP |
 |
Office of the Board of Councillors of North Dum Dum Municipality |
 |
Corringendum & Addenda for the work construction |
 |
Corringendum : Ref: Notice inviting tender No.WKM/005/2007-08 dated. 13.09.07 |
 |
Construction of Housing & Physical Infrastructure |
 |
Corringendum : Tender Notice no. 1/BSUP/2007-2008 2nd call extension |
 |
Corringendum |
 |
Construction of 25 nos single unit dwelling house in 4 groups in 6 nos slum area inviz Nayabajar in ward no 8 |
 |
Construction of single storied Dwelling house including allied Infrastructural development works |
 |
Corrigendum in connection with the NIT No. 02/SE(S)/BSUP/KMDA of 2007-2008 dated 22.08.2007 |
 |
Corrigendum and address for NIT No. 03/SE(N)/BSUP |
 |
One No 4 storied residential building for 32 families as slum dwellers(2nd call) |
 |
Notice inviting application for empanelment of agencies for Biometric Survey |
 |
Improvement of slum level infrastructure development work including dwelling house at Sabinara ward no 19 |
 |
Construction of 3 storied Building of Police Training School of Kolkata Police at 247, A. J. C. Bose Road |
 |
Laying of pipe line Mitpara slum area in ward no 30( D.I. pipe will be the recovery item) |
 |
CORRIGENDUM : Ref: Abridged tender notice no. 141-BM/WD-05/T-4/BSUP(Ph-I)/2007-08 dated 23.07.2007 |
 |
One No 4 storied residential building for 32 families as slum dwellers |
 |
CORRIGENDUM : Ref: Abridged tender notice no. UKM/004/BSUP/2007-08 dated 10.08.2007 |
 |
Construction of 25 nos single unit dwelling house in 8 groups in 6 nos slum area inviz Nayabajar in ward no 8 |
 |
Group A: Improvement of slum level infrastructure development work including dwelling house |
 |
Construction of Single storied Dweling Houses includind allied Infrastructural Development works at different Slums under UKM |
 |
Supply of DI pipes of dia ranging from 100mm to 500 mm centrifugally cast(Spun) Ductile Iron Pressure Pipes for water supply |
 |
Construction of dwelling houses of 25 units at Natunpara |
 |
Supply of DI pipes of dia ranging from 100mm to 500 mm centrifugally cast(Spun) Ductile Iron Pressure Pipes for water supply |
 |
Construction of dwelling houses of 25 units at Natunpara |
 |
Supply of DI pipes of dia ranging from 80mm to 150 mm centrifugally cast(Spun) Ductile Iron Pressure Pipes for water supply |
 |
Construction of 6 nos four-storied residential building for 136 families of Slum Dwellers |
 |
Construction of approach path to Tallah P.S. cum Barrack Building at 6, Tarashankar Sarani, Kol-2 |
 |
Construction of Dwelling house (Single storied) and basic infrastructures (concrete Roads, drain etc.) at Fatepur Muslimpara Slum |
 |
Housing (Each cluster having min 25 nos.) @ rs. 1 Lakh each unit |
 |
One No. 4 stored residential building for 32 families as Slum dwellers. |
 |
submission of the rate (Supply) for supplying of DI pipe ranging from 100 mm dia to 450 mm dia for water supply scheme |
 |
construction of Dwelling units, conc.Pathways surface drains and allied works in different wards of Raja hat- Gopalpur Municipality |
 |
Construction of dwelling units and allied works in different Slums under Barasat Municipality. |
 |
Construction of Housing and Phisical Infrastructure (Road, Drain, Water Line, Sewer line, Concrete Road, Pathway, Street Light) at D.N. Bhattacharya Harijon Bustee, Slum Land In Ward No. 23. BLOCK-1 |